|
About the 2D Catenary & Cable Structures category
|
|
1
|
256
|
29 November 2022
|
|
1. Introduction and course overview (2D Catenary & Cable)
|
|
0
|
333
|
29 November 2022
|
|
2. Course prerequisites (2D Catenary & Cable)
|
|
0
|
242
|
29 November 2022
|
|
3. Section overview (2D Catenary & Cable)
|
|
0
|
261
|
29 November 2022
|
|
4. Deriving a linear heavy cable equation
|
|
4
|
663
|
20 June 2025
|
|
5. Accounting for cable self-weight
|
|
0
|
304
|
29 November 2022
|
|
6. Problem-specific boundary conditions
|
|
0
|
290
|
29 November 2022
|
|
7. Solving for max cable tension
|
|
0
|
285
|
29 November 2022
|
|
8. Section overview (2D Catenary & Cable)
|
|
0
|
366
|
29 November 2022
|
|
9. What is non-linear structural behaviour?
|
|
0
|
232
|
29 November 2022
|
|
10. Large deflections and geometric non-linearity
|
|
2
|
411
|
1 March 2024
|
|
11. An iterative solution strategy
|
|
0
|
248
|
29 November 2022
|
|
12. Section overview
|
|
0
|
245
|
29 November 2022
|
|
13. Building the transformation matrix
|
|
3
|
302
|
10 January 2025
|
|
14. The linear stiffness matrix
|
|
0
|
252
|
29 November 2022
|
|
15. Additional force due to large deflections
|
|
2
|
289
|
15 July 2025
|
|
16. The local non-linear stiffness matrix
|
|
0
|
251
|
29 November 2022
|
|
17. The global non-linear stiffness matrix
|
|
0
|
289
|
29 November 2022
|
|
18. Section overview (2D Catenary & Cable)
|
|
0
|
241
|
29 November 2022
|
|
19. Initial setup and data import
|
|
4
|
404
|
18 January 2026
|
|
20. Plotting the initial configuration
|
|
2
|
367
|
20 January 2026
|
|
21. Blocking out the main convergence loop
|
|
0
|
242
|
29 November 2022
|
|
22. Building the transformation matrices
|
|
0
|
229
|
29 November 2022
|
|
23. Adding pre-tension to each member
|
|
0
|
243
|
29 November 2022
|
|
24. Building the stiffness matrix
|
|
0
|
231
|
29 November 2022
|
|
25. Solving for displacements
|
|
0
|
255
|
29 November 2022
|
|
26. Updating the internal force system
|
|
0
|
245
|
29 November 2022
|
|
27. Building a convergence test function
|
|
0
|
265
|
29 November 2022
|
|
28. Calculating axial forces
|
|
0
|
235
|
29 November 2022
|
|
29. Allowing for smaller external force increments
|
|
3
|
293
|
23 March 2026
|